January and February were demolition and construction months. In addition to the outside work, interior walls came down, floors were removed and the makeshift kitchen was installed in the living room — minus any water. We used the shower for dishes.
But, day by day, we could see the architect’s drawings coming alive in three dimensions.
0 Comments